Case Studies Real Results
Don’t take our word for it — see what changed for clients when we focused on verifiable controls and practical fixes.
Book a Free ConsultationKelvin TOP‑SET® Investigation (Logistics)
Eliminated vehicle–pedestrian near misses through engineered separation, visual controls and radio discipline.
PSM Implementation (Chemicals)
RBPS‑aligned programme, closed 85% of findings in 90 days, verified “must‑not‑fail” safeguards.
Risk Assessment Overhaul (Manufacturing)
Rationalised 120+ assessments; 35% reduction in high/medium risks.
SSIP First‑Time Approval (Contractor)
CHAS & SafeContractor approvals in 14 days; reusable evidence pack.